Profile Group Schedule

General Discussion in English
Post Reply
KolbyG
Posts: 6
Joined: Thu Jun 12, 2025 7:28 pm

Profile Group Schedule

Post by KolbyG »

Is there a way to add a schedule for a profile group, and then have Syncovery run through each job within the group one at a time (ideally halting the whole group if one of the jobs fails)?
I have a growing list of jobs, and scheduling them to all run independently of one another is proving to be challenging using timing alone.

Thanks!
Post Reply