Hi,
All my scheduled jobs that sync to cloud (WebDAV) take a very long time after the PC starts from standby.
Sometimes, they run successfully after several minutes, sometimes they run into timeout.
Is there a possibility to delay the scheduler after starting the PC from standby or hibernate?
Delay scheduled jobs after start from standby
Re: Delay scheduled jobs after start from standby
It seems as if network connectivity is not available directly after start/wakeup when the jobs start to run.
I have attached a log file.
I have attached a log file.
- Attachments
-
- WebDAV_T_Online Various - 2024-10-30 21.10.30 - 0 copied, 2 subfolders inaccessible, Duration 20.47.38.log.gz
- (2.7 KiB) Downloaded 191 times
Re: Delay scheduled jobs after start from standby
I seem to be the only one with this problem...
Re: Delay scheduled jobs after start from standby
Hi,
sorry for the delay in my response, I will think about what can be done.
sorry for the delay in my response, I will think about what can be done.
Re: Delay scheduled jobs after start from standby
That would be great!